TY - RPRT TI - Scoping Opinion for Dogger Bank D Offshore Wind Farm AU - The Planning Inspectorate for England and Wales AB - On 21 April 2023, the Planning Inspectorate (the Inspectorate) received an application for a Scoping Opinion from SSE Renewables and Equinor (the Applicant) under Regulation 10 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the EIA Regulations) for the proposed Dogger Bank D Offshore Wind Farm (the Proposed Development). The Applicant notified the Secretary of State (SoS) under Regulation 8(1)(b) of those regulations that they propose to provide an Environmental Statement (ES) in respect of the Proposed Development and by virtue of Regulation 6(2)(a), the Proposed Development is ‘EIA development'. The Applicant provided the necessary information to inform a request under EIA Regulation 10(3) in the form of a Scoping Report, available from: http://infrastructure.planninginspectorate.gov.uk/document/EN010144000011This document is the Scoping Opinion (the Opinion) adopted by the Inspectorate on behalf of the SoS. This Opinion is made on the basis of the information provided in the Scoping Report, reflecting the Proposed Development as currently described by the Applicant. This Opinion should be read in conjunction with the Applicant’s Scoping Report. DA - 2023/06// PY - 2023 SP - 204 PB - The Planning Inspectorate for England and Wales SN - EN010144 UR - https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/EN010144/EN010144-000018-EN010144%20-%20Scoping%20Opinion.pdf LA - English KW - Wind Energy KW - Fixed Offshore Wind ER -