TY - RPRT TI - Burbo Bank Extension Offshore Wind Farm Volume 2: ES Biological Environment AU - Dong Energy AB - The Project for which development consent is sought consists of an extension westwards of the existing Burbo Bsnk offshore wind farm. The proposed offshore Project site covers an area of 40 kmĀ² which lies approximately 7 km north off the North Wirral coast. The maximum capacity of the wind farm will be up to 258 MW, consisting of offshore wind turbines and foundations, an offshore substation, buried inter-array and export cable(s), buried onshore cable(s) from the cable landfall in North Wales between Rhyl and Prestatyn to a new onshore substation next to the Bodelwyddan substation near St Asaph in Denbighshire where the cable will connect with the National Grid. Chapters included in document: Fish and Shellfish Ecology, Marine Mammals, Ornithology, and Commercial Fisheries. DA - 2013/03// PY - 2013 SP - 610 PB - ABP Marine Environmental Research Ltd (ABPmer) SN - 5.1.2 UR - https://www.yumpu.com/en/document/view/19794555/burbo-bank-extension-offshore-wind-farm-national-infrastructure- LA - English KW - Wind Energy KW - Fixed Offshore Wind KW - Attraction KW - Avoidance KW - Collision KW - Displacement KW - Birds KW - Fish KW - Marine Mammals ER -